19/09/2026
We were called out to a property in Leyland after the existing LVT floor started showing some issues.
As you can see from the photos, there were large lines and cracks appearing through the finished flooring, particularly where the existing house slab meets the newer extension.
Once we uplifted the LVT, it became clear there were also moisture issues within the subfloor.
We stripped everything back and allowed the subfloor time to air out.
We then returned to the job and applied an epoxy DPM, followed by smoothing compound to create the suitable surface needed for the new LVT flooring.
Preparation is the most important part of the job — getting the subfloor right before putting a new floor down is essential. 💯
Next post will be the finished transformation… Herringbone LVT completed 🔥