17/09/2026
Cup delays usually start at sampling, not production. Here's our flow so your PO doesn't slip:
📐 Share the spec — density 25–30, ILD 28–35, 4-grade anti-yellow.
🧰 2000+ ready molds — sample in 1–2 days if one fits.
🛠 New mold — cut in 3–7 days (≈50% faster than norm).
💨 Vented by default, 1.5–2 mm, 6–12 holes, free.
📦 MOQ 500 pairs; sampling sized to your need.
Fast, accurate samples = cheapest trust. Senfeng: Dongguan PU cups, OEKO-TEX+GRS+ISO 9001, 95%+ yield, Sinosure-covered.
🌐 www.sf-bracup.com | WhatsApp: +86 137 1289 0858