10/08/2026
⚡ Powering the Future of Heavy-Duty Electric Transportation with MW-Level Ultra-Fast Charging Solutions
❔Why does charging a heavy-duty truck still take so long?
❔Why are marine charging stations so expensive to build and operate?
As the demand for electric heavy trucks and vessels continues to grow, traditional charging infrastructure faces major challenges — limited power output, low charging efficiency, and high construction and operation costs.
But we believe there is a better way.
CEEG has developed a MW-level ultra-fast charging solution designed to overcome these challenges through innovative power conversion and transmission technologies.
Our MW charging solutions have already been successfully implemented in multiple real-world projects, including:
✅ Shanghai Songjiang No.2 Heavy-Duty Truck Battery Swapping Station Project
✅ Jianhu Jufeng New Energy Heavy-Duty Truck Charging Station Project in Yancheng
✅ Linzi Heavy-Duty Truck Battery Swapping Station Project
✅ 9,000 DWT New Energy Bulk Carrier Mobile Charging Project
By optimizing the entire power conversion process, our solution achieves up to 96.5% overall station efficiency, significantly improving energy utilization and reducing operating costs.
Based on an industrial electricity price of 0.8–1.0 RMB/kWh, a single charging station can save approximately RMB 190,000–240,000 in annual electricity costs.
From heavy-duty trucks to marine vessels, from land to sea, CEEG is accelerating the transition toward more efficient, greener, and smarter electric transportation infrastructure.
Together, let’s build the future of new energy logistics. 🌱⚡