14/02/2026
We are always prepared to accept a challenge when others wilted & walked away and this village hall floor was certainly a challenge. We had to remove multiple layers of lacquer and polish that had been applied over a 50 year period to expose this considerably lighter Granwood floor. It took us a little longer that expected but with perseverance we got over the line and the hall will be back in use on Monday.