21/09/2025
Beca HOUSE – INSTALLATION & COMMISSIONING OF POWER QUALITY SYSTEM
LPINZ is proud to share the next stage of our work at BECA House, Wynyard Quarter – Site 6.
Following LPINZ comprehensive power quality audit and monitoring assessment, our team designed a tailored power quality solution to address harmonic distortion, unbalanced loads, and power factor issues identified during the audit.
We’re pleased to announce that we have now supplied and successfully commissioned the complete system – including CIRCUTOR AFQm Active Harmonic Filters with a total capacity of 500 Amps.
This solution will:
✅ Significantly improve power quality and network stability
✅ Deliver cost savings through energy efficiency improvements
✅ Extend the lifespan of electrical infrastructure by reducing stress on equipment
This project showcases LPINZ’s full capability – from monitoring and analysis to design, supply, commissioning and implementation of advanced energy solutions.
We’re proud to support BISHMAN LIMITED Electrical and play a role in optimising the electrical performance of one of Auckland’s key commercial precincts.
👉 At LPINZ, our engineering team is always available for a friendly chat on how we can assist you or your clients with expert advice on power quality challenges – whether it’s Battery Energy Storage (BESS), ultra-fast EV chargers with integrated battery, UPS systems, generators, Earthing design/equipment supply or surge and lightning protection. Feel free to reach out anytime and connect with one of our electrical engineers!