09/15/2026
Here is the before-and-after of a whole-house hardwood flooring installation. It was a highly detailed process: first, we cleaned the entire floor surface and applied Premium P106 Primer; next, we leveled the entire house using over 100 bags of self-leveling compound and allowed the floor to dry for several days before installing beautiful hardwood flooring. The results were 100% professional, leaving our clients satisfied and happy with our service and workmanship..