HEPACART

HEPACART Environment and Infection Control, Dust Containment and Installation Solutions

http://www.hepacart.com/ HEPACART Inc.

based in Shawnee, Kansas (Kansas City metro area) is the leading manufacturer of high quality dust containment solutions for hospital construction, renovation, and maintenance. HEPACARToffers multiple types of HEPACARTs with various sizes and options. HEPACARTs that provide only containment without HEPA filtering sometimes use the brand, Dust Buggy. All options developed by
HEPACART were the direc

t result of a user’s request to configure the cart that would make them most productive. Recent custom request like pass thru slips and the multiple tile adapters are now standard options. Custom work is also available because productivity is one of our key goals. HEPACART was developed from hospital work required by its sister company, TED Systems LLC. TED Systems provides security, access, video, fire alarm, sound, and nurse call products and services. TED Systems searched for a product that would protect patients; be efficient to reduce interruption to the hospital staff; and meet the labor schedule. All market products were evaluated- none met the criteria. The result was the manufacture of our initial HEPACART. HEPACART has since grown to various types, sizes, and options to better support our growing list of hospitals and hospital contractors. HEPACARTs are in use at Mass General, MD Anderson, children’s hospitals in Chicago, Washington DC, Ft. Worth , and hundreds of other hospitals in the United States and Canada.

“HEPACARTs protect patients and productivity.” For more information about HEPACART Inc. Visit www.hepacart.com , call 913.789.9590, or fax 913.677.5772
mailto:[email protected]

Airborne contaminants don't wait for a break in the schedule.Neither should your filtration.HEPAFORCE Air is built for o...
09/09/2026

Airborne contaminants don't wait for a break in the schedule.

Neither should your filtration.

HEPAFORCE Air is built for one job: moving powerful volumes of air while capturing what needs to stay out of occupied healthcare spaces. Not adequate air handling. Not "good enough" for now.

Real negative air pressure.
Real HEPA capture.
Real containment integrity.

When the stakes are patient safety, powerful isn't a nice-to-have. It's the standard.

"We've always done it this way" isn't proof a process works. It's proof it hasn't been challenged yet.A containment conf...
09/07/2026

"We've always done it this way" isn't proof a process works. It's proof it hasn't been challenged yet.

A containment configuration that's been used on forty jobs without incident feels safe. But that's familiarity, not verification. The barrier was never tested against the room, the negative air machine was never measured against the actual requirement, and the documentation was completed the day after setup, not during it.

Legacy habits survive because they're rarely tested against the standard they're supposed to meet. That's a different claim than actually meeting it.
When an auditor or infection preventionist asks why a process is set up a certain way, "it's how we've always done it" isn't an answer. A verified process is.

Read the full breakdown of where legacy habits break down, and what actually holds up when someone asks why:

Legacy infection control habits often survive because no one has tested them. Why 'we've always done it this way' collapses under real audit pressure.

Why 'We’ve Always Done It This Way' Fails Under Audit Pressure
09/07/2026

Why 'We’ve Always Done It This Way' Fails Under Audit Pressure

Legacy infection control habits often survive because no one has tested them. Why 'we've always done it this way' collapses under real audit pressure.

Containment integrity isn't one product. It's a system.Here's what a fully equipped setup looks like in the field:🚪 Ante...
09/02/2026

Containment integrity isn't one product. It's a system.

Here's what a fully equipped setup looks like in the field:

🚪 AnteRoom — controlled entry and exit for the containment zone
🌬️ DuctZone — keeping exhaust pathways clean and compliant
💨 HepaForce — heavy duty filtration doing the real work

Three pieces. One goal: protecting patients, staff, and occupied spaces while construction happens around them.

ICRA compliance isn't a checkbox you tick once. It's built into every seam, seal, and airflow path.

This is what it looks like when containment is done right. ✅

6 Signs Your Infection Control Process Wouldn't Hold Up in an Audit
08/31/2026

6 Signs Your Infection Control Process Wouldn't Hold Up in an Audit

Most gaps in healthcare compliance audits aren't visible until a surveyor asks the wrong question. Here are 6 signs your process has a gap right now.

"The GermBuster is a must for anyone thinking of protecting their staff and patients." — Dr. Ilya Benjamin, practicing d...
08/28/2026

"The GermBuster is a must for anyone thinking of protecting their staff and patients." — Dr. Ilya Benjamin, practicing dentist, Las Vegas

That's the kind of feedback we build for. GermBuster 300 captures 99.97% of airborne particles down to 0.3 microns, delivers up to 330 CFM, and can clean a 400 sq. ft. room six times an hour. Reliable protection for staff and patients, without adding complexity to your day.

Room turnover speed feels like the right way to judge a HEPA filtration upgrade. It isn't.It only measures today's sched...
08/27/2026

Room turnover speed feels like the right way to judge a HEPA filtration upgrade. It isn't.

It only measures today's schedule impact against an assumption: that your current setup won't fail an inspection, trigger a review, or force rework down the line.

The real test isn't "how fast." It's whether your equipment meets verified air change requirements, performs the same way every time, and holds up regardless of who's running setup that day.

Protecting speed today is often the decision that costs you the most time later.

We break down what facilities and infection control teams should actually be testing for:

Rejecting HEPA filtration or new air controls to protect room turnover often creates bigger delays later. Here's the test that should replace it.

Protect patient-care spaces during construction and maintenance with the HEPACART® AnteRoom. This total room isolation m...
08/26/2026

Protect patient-care spaces during construction and maintenance with the HEPACART® AnteRoom. This total room isolation module helps mitigate risk from work dust and related contaminants, with quick, tool-free installation and compatibility with various air filtration systems. Designed to meet ICRA Class I–V specification requirements, the AnteRoom helps your team maintain a safer, cleaner work environment while keeping projects on track.

Learn more: https://hubs.li/Q04vrhdZ0

Floor-level work still means airborne risk. 🚧Tile removal, coring, flooring demo. It all kicks up dust fast, right at th...
08/21/2026

Floor-level work still means airborne risk. 🚧

Tile removal, coring, flooring demo. It all kicks up dust fast, right at the level where patients and staff move through the space.

Before crews start, ask:
📍 Where exactly is the work happening?
👥 Who's walking through that zone daily?
💨 How is dust getting contained, not just swept?
🛠️ Does the setup actually fit the task?

Floor-level work isn't automatically lower risk. It just means the containment plan has to match the ground it's covering. ✅

See how HEPACART FloorZone is built for exactly this. 👇

FloorZone delivers mobile containment for flooring, coring, & remediation projects. Built-in HEPA filtration & push-button control support ICRA compliance

🏥 Healthcare renovations don't pause the rest of the building.Patients, staff, and equipment are still moving through th...
08/20/2026

🏥 Healthcare renovations don't pause the rest of the building.

Patients, staff, and equipment are still moving through the space while the work happens around them. That's what makes containment planning different in a healthcare setting. It's not just about the project. It's about everything happening next to it.

Before the first tool comes out, a few questions are worth settling:
🔧 What's the ICRA Compliance Level for this project, and does it match the scope of work?
🌬️ Where is negative air needed, and is the equipment sized for the space?
✅ Who's responsible for checking containment integrity once work is underway?

Getting these answered early means fewer surprises once crews are on site.

Swipe through for the full checklist

Address

9828 Pflumm Road
Lenexa, KS
66215

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+19137899590

Alerts

Be the first to know and let us send you an email when HEPACART posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to HEPACART:

Shortcuts

Share