6 Mile Outpost Weekly Update
This week has been all about finishes starting to come together.
Flooring is currently underway and should be completed by the end of the week. Painting has also started throughout the liquor store, and the faux log siding is now going up along the sides of the building while the brown siding continues on the front and back.
Power and water are now connected to the building, which allows crews to begin moving into fixtures next. Lighting, plumbing fixtures, shelving, and other interior pieces will start being installed as the spaces continue to take shape.
Inside, the interior trusses are in, and countertops are still scheduled to begin the week of the 24th. The liquor store coolers are installed and still waiting on their doors.
Outside, landscaping is starting to become more noticeable with fencing going in and sod beginning to be laid.
A lot of the major construction is behind us now, and we are getting into the details that will really start making each space feel finished.
See you at the Outpost.