07/02/2026
Subfloor preparation is the foundation of any successful flooring project. 📐We recently stepped in to rectify a failing floor where tile had been improperly installed directly over a particle board instead of hardibacker. Predictably, moisture and deflection caused the bond to fail, leading to widespread cracking and lifting. Our team removed the failed material, stabilized the subfloor foundation, and seamlessly ran high-durability luxury vinyl plank continuously through the main entry, kitchen, laundry room, and bathroom as shown in this video, Binos Flooring is wrapping up the project finishing the moldings and putting appliances back and resetting the toilet. For property managers, realtors, homeowners & general contractors, protecting your investment means hiring an installer who knows the technical standards from the subfloor up. With 13 years as a licensed contractor and 30 years in the trade, Bino’s Flooring delivers reliable results. 💻 Connect with us at www.binosfloorings.com or DM us here to discuss your next project.
📋 CSLB Lic-985819
•