06/01/2025
Sunday evening in the shop... actually started on Saturday afternoon. The older I get, the more light I need, so I decided to add 8 LED lights to the ceiling on the messy side of the shop. I knew in advance that I'd have to move a few items to gain access with a ladder.
I also thought there were a few pieces that I would move permanently.
For starters, I moved the dust collector for the table saw closer to the garage door. But to do that, I'd have to move the table saw. To do that, I'd have to disassemble the extension tables that are attached to it, and move the sanding table (a behemoth 3'x12' steel table) that was parked against the back side of the table saw. While breaking this stuff down, I'm amazed at just how much saw dust has accumulated under these tables...filled almost 2 -30 gallon trash cans!
So, sweep the floor in this area, and position the dust collector where I wanted it.
At this point I was able to put up 4 of 8 shop lights. Noticably better!The table saw, now moved 3' from the wall, and 1' further into the shop, gives me a little more room to cut longer boards, even if I don't have to do that very often.
But moving the table saw forced the sanding table into the area where I have several router tables set up. And moving the router tables into the space where the planer, drum sander, assembly table and yet another dust collector made the area a bit overloaded, and I still needed a path to hand 4 more lights...which ultimately is the reason this whole thing started.......I can see this turning into the Epic of Gilgamesh...
To land the plane...the second half of my quest to hang some lights went very much like the first half...I want to do this, but I have to do that first, and the other thing is in the way, and the phone is ringing....
I did get my task completed, but I'll be spending Monday looking for my tape measure.